  1. Iron Horse Ranch

Ranch House Construction

Read More
  • Moving in fill to build up the House Pad

    Moving in fill to build up the House Pad

  • House Pad  watered, packed and levelted

    House Pad watered, packed and levelted

  • Foundation framing placed

    Foundation framing placed

  • Exterior Footings dug up to 5'4"

    Exterior Footings dug up to 5'4"

  • Center house footings 2' or more

    Center house footings 2' or more

  • Master Bath plumbing

    Master Bath plumbing

  • Untitled photo
  • the Boss inspects steel reinforcement....up to 5/8" in beams

    the Boss inspects steel reinforcement....up to 5/8" in beams

  • Finished reinforcement

    Finished reinforcement

  • Fireplace detail

    Fireplace detail

  • West wall footing 5'4" with 3 layers of 5/8" bar

    West wall footing 5'4" with 3 layers of 5/8" bar

  • Concrete Pour starts at 02:30 when temperature is lower

    Concrete Pour starts at 02:30 when temperature is lower

  • Pumper truck allows for continuous filling of foundation

    Pumper truck allows for continuous filling of foundation

  • Pumper controls application of more concrete

    Pumper controls application of more concrete

  • Garage work are being finished

    Garage work are being finished

  • Aerial view from ranch drone

    Aerial view from ranch drone

    DCIM\100MEDIA

  • Aerial view from ranch drone

    Aerial view from ranch drone

    DCIM\100MEDIA

  • 5/8" reinforcement placed for Storm Room

    5/8" reinforcement placed for Storm Room

  • Finishing starts as patio is poured

    Finishing starts as patio is poured

  • Inner plywood wall for Storm Room

    Inner plywood wall for Storm Room

  • Storm Room door fitted and will be set in reinforced concrete

    Storm Room door fitted and will be set in reinforced concrete

  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.
    Storm Room door fitted and will be set in reinforced concrete
    Getting ready to fill the Storm Room walls
    8" of concrete and steel to fill space between inner and outer walls