Moving in fill to build up the House Pad
House Pad watered, packed and levelted
Foundation framing placed
Exterior Footings dug up to 5'4"
Center house footings 2' or more
Master Bath plumbing
the Boss inspects steel reinforcement....up to 5/8" in beams
Finished reinforcement
Fireplace detail
West wall footing 5'4" with 3 layers of 5/8" bar
Concrete Pour starts at 02:30 when temperature is lower
Pumper truck allows for continuous filling of foundation
Pumper controls application of more concrete
Garage work are being finished
Aerial view from ranch drone
DCIM\100MEDIA
5/8" reinforcement placed for Storm Room
Finishing starts as patio is poured
Inner plywood wall for Storm Room
Storm Room door fitted and will be set in reinforced concrete